The week results in the project "Duyunov's motors"
This week a lot of important preparatory work has been completed for various project development directions:
- we received the final revision of the documents for "SovElMash" laboratory certification;
- preparation for producing the first batch of size-90 2.2 kW motors for 1,000 revolutions is well underway in the testing area in Zelenograd. These motors in IE1 frame will have the performance parameters of energy efficiency class IE3;
- the work on "SovElMash" controller continues;
- two new patent applications were prepared with "SovElMash" as their rightholder;
- the work on the website sovelmash.ru is about to be completed. In the final revision we took into consideration the suggestions of the project participants. The texts have been provided for translation into English.
News concerning the construction of "SovElMash" innovative centre in the SEZ "Technopolis "Moscow":
- the site is being cleared from vegetation;
- the project of the site fencing is being developed, the site contractor has already been chosen;
- the preparation for various audits and approval procedures required for the erection of reinforced concrete frames for the future innovative centre footing is underway.
As soon as the preparatory activities at the site are over, the online streaming from the construction site will be arranged.