Project work routine
16 Mei 2018
Currently:
• the drive tests of 318-size “Kolobok” continue;
• repair works are being completed in the test area, preliminary equipment positioning is underway;
• today we are expecting the delivery of a die casting machine;
• the winding machine is being debugged.