Test Bench Equipment Startup and Other Preliminary Work in the Laboratory
28 Maret 2018
Just as Dmitriy Aleksandrovich planned, we have completed the first switching on and startup of the test bench equipment! "When it depends only on us – we follow the schedule!" – Duyunov says.
Alexander Sudarev was a witness of this important event and had a chance to see no-load operation of one of the asynchronous motors of ADM-71 type with the purpose of measuring its performance.
At the same time, a big loading machine for full-scale testing of wheel motors is being assembled in the laboratory.