The line for testing hub motors
1 junij 2018
Evgeniy Duyunov told that on May 31 the alignment of the line for testing hub motors had been successfully completed.
The line consists of a loading machine, strain gauge box for torque measurement, layshaft that provides side load relief to the connection box, and pulley. The line components are connected by special couplings.
Yesterday the fastener system for hub motors was assembled, the belt tightener – made and mounted.
Yesterday the fastener system for hub motors was assembled, the belt tightener – made and mounted.
All that is left to do is to connect the cooling system to the loading machine and hub motor testing can be started!