Новости проекта от Дмитрия Дуюнова
A universal turn-milling machine, auxiliary equipment for fastening electric machines, three-phase voltage stabilizer, positioning table and calibrated pads have arrived.
More equipment continues to arrive, so all specialists are given a full load of work.
Alabushevo business is forging ahead, the talks are underway.
We received e-car motors from Saint Petersburg which had been re-engineered from the general purpose industrial ones and modernized.
The motors will be tested to check their performance.
From the scope of general tasks:
- current sensors have been combined, powered, the binding is in progress thanks to which it’s possible to measure current of up to 500 Ampere;
- remote-mount cables have been made to measure voltage not on the device, but directly on the “consumer”.
This week an additional equipment supply is expected.
At the end of the week it’s planned to mount nitrogen plant, position the chillers, bind the cooling system on the loading machine and connect other devices.
The scope of work is great, the team has been seriously preparing for it for a long time.